Test #one: Lay a rubber mat down to the floor and Verify again in 24 several hours. If the bottom from the mat has moisture on it, the floor just isn't able to be painted. We poured equal amounts of both of those Element A (resin) and Part B (hardener) https://www.showcasefinishing.com/epoxy-resinous/