The designs also include a big battery at the location, to be sure excess power might be stored with the evening, along with a 220 kV transmission line that will connect the challenge to your North Star sub-station, close to in which a completely new 100 MW solar venture is https://citypointsolar.com.au/50kw-solar-system/